Learn about the ongoing 公共工程 repair projects to county roads and right of ways from damage caused by Hurricane Ian.
Caring Way and Brinson Avenue 人行道上
最后更新日期:2023年10月23日 类别:人行道 当前阶段: Planning and Project Approval
Caring Way and Brinson Avenue 人行道上Landfill Scale House (Zemel 路)
最后更新日期:2023年10月20日 Category: 县设施 当前阶段: Planning and Project Approval
The scale house at the Zemel 路 Landfill is currently a trailer nearing end of expected usable lifecycle. 另外, not compliant with the County's Ordinance of not utilizing trailers as permanent operations. The project would move the physical location of the scale house and its ancillary functions of a convenience center and household hazardous waste. The project will also streamline the flow and control of traffic in and out of the landfill.
Riverside Boat Ramp Replacement
最后更新日期:2023年10月20日 Category: 公园和娱乐 当前阶段: Planning and Project Approval
作为CMP的一部分, 社区服务 is conducting structural assessments on all piers, 栈道, seawalls and boat ramps; through this assessment process it was bought to CS attention that Riverside Boat Ramp provides immediate safety concerns. During the site analysis the engineer determined the ramp could not be repaired in place; this project will be to design a replacement ramp that alleviates the safety issues.
Supervisor of Elections Warehouse
最后更新日期:2023年10月20日 Category: 县设施 Category: 已缴纳的销售税 当前阶段: 设计开发
提供新的20,000 sqft +/- facility up to current code, meet needs of required climate controlledspace by the Supervisor of Elections. The facility shall include climate-controlled storage area for sensitive polling equipment and related supplies and support staff. Must be readily accessible and support staff needs for monitoring tabulation. Preferably house SOE administrative offices and serve public visitation in the same location. Includes 10,000 sqft for emergency managemnet and facilites.Sheriff 政府 and Hardened 911 Facility
最后更新日期:2023年10月20日 Category: 已缴纳的销售税 Category: 县设施 当前阶段: 设计开发
Current facility is on airport-owned land with lease term up for renewal in 2023. Current building is a metal building repaired from damage in Hurrican Charley which is still suseptible to hurrican damage. It is not functionally laid out for current needs or growth. It is not designed or constructed to the needs of a modern law enforcement agency. E 911 will be colocated in the same facility.Port Charlotte Beach 娱乐 Center
最后更新日期:2023年10月20日 Category: 公园和娱乐 Category: 已缴纳的销售税 当前阶段: 设计开发
Design a new recreation center that will serve the current needs of rental venue for events, as well as community facilities for sailing and regatta events.Harold Avenue Generator Mitigation Grant
最后更新日期:2023年10月20日 当前阶段: 离职及清仓
This Mitigation Grant funded project will provide a permanent backup generator and enclosure for the Harold Avenue 娱乐 Center.